Baillie baillie 1300 422 455
For architects and builders

Specified early, documented properly.

Technology is the trade most often left until the drawings are finished, and the one that suffers

Conargo Estate, Flinders. Cantilevered form against the stone wall.
Conargo Estate, Flinders. Cantilevered form against the stone wall.
For architects and builders

What you receive

  • Device mark-ups on your plans: keypads, screens, speakers, sensors, antennas, cable runs
  • Equipment rack elevations, sized and ventilated, with the joinery allowance settled early
  • Cable schedules the electrician can work from, labelled both ends
  • A written scope detailed enough that tendered prices are comparable
  • Our prewire standard, issued on request

What we need, and when

Concept stage

the plans and the brief

Enough to mark up: floor plans, a reflected ceiling plan if it exists, and a conversation about how

the home will be used. Early is cheap. Late is not.

Design development

finishes and joinery

Keypad and screen locations are a finishes decision as much as a technical one. We work to the

interior designer's palette and the cabinet maker's details rather than around them.

Construction

your program

We work to the builder's dates from rough-in through second fix to commissioning, and we attend the

site meetings that matter rather than all of them.

One point of accountability

Lighting control, shade, audio, cinema, network, CCTV, intercom and access come from one studio,

on one system, with one contact. The alternative is five subcontractors and an integration problem

that becomes the builder's to solve.

Working with us

Projects are taken on in small numbers each year, and the design phase is engaged before tender.

If you have a project at concept stage, the studio will come to you.

only. Check the deliverables list against what D&D actually issues. -->

BeginControl4 Diamond Dealers ยท CEDIA 2026 finalist

Quietly extraordinary.